[1]
J. Escobar, “Jaime Escobar - Technical and Operational Feasibility, for the business analysis, of running an AutopistaFerroviariawith Iberian track gauge between Port of Algeciras and Zaragoza-Plaza”, Jorn. jovenes investig. I3A, vol. 8, Dec. 2020, doi: 10.26754/jjii3a.4983.